Project
Gold Mining in the Kyrgyz Republic
  • Country
    Kyrgyz Republic
  • Region
    Talas
  • Group Company
    Alliance Altyn
Project

About the Project

Alliance Altyn is licensed to develop Jerooy gold deposit and explore Jerooy area.

In October 2019, Alliance Altyn started open-pit mining operations.

In March 2021, the construction of Talas Gold Mining Plant with a capacity of 1.3 million tonnes of ore per year was completed.

The life span of the deposit is at least 25 years. Approved Technical Project provides for extraction of about 88 tons of gold.

Large upland gold ore deposit best in terms of capacity, grade and extraction located in the Kyrgyz Republic

Favorable geology: a steep-dipping ore body reaching the surface

Best international environmental standards

Modern technologies of global leaders

 

Geography
Geography
Geography
The project is being implemented in Talas District of Talas Region of the Kyrgyz Republic.
Zoom Out Zoom In
Indicators

Key indicators

Large upland gold ore deposit best in terms of capacity, grade and extraction. It was discovered in 1969 and intensively explored in 1984.

A steep-dipping ore body (stockwork) with outcrop, the depth up to 700 meters.

Continuous gold grade with rich core (10 g/t).

A rich deposit with a high average gold grade and a 90% recovery factor
Total Ore Volume
21
million tonnes
Life of mine
25
years
Resource base upside potential
1
million ounces of gold

 

Proved and probable gold reserves
2.68
million ounces
Resources
3.2
million ounces

Average grade in ore

Gold Silver
3.71 g/t 1.04 g/t

 

 

Project Implementation