Gold mining in Khabarovsk Territory
Experience and technical capabilities provide the opportunity for extraction of gold in a harsh climate with complex logistics
Implementation

Project Implementation

Yubileyny Mining and Processing Plant processes ore from Krasivoye deposit and concentrate produced at Perevalny Mining and Processing Plant year-round.

Alluvial gold deposits are developed from May to October.

Stable growth in gold production over the last five years was ensured by modernizing production and commissioning of new facilities
Ore output
542
thousand tonnes
Gold Production
53
thousand ounces
 
 
Production
Production
Two mining and processing plants provide year-round processing of ore.

Gravity and flotation ore concentration technology is used for extraction of gold at Yubileyny Mining and Processing Plant. Target gold recovery factor at the gold concentration plant is 83%.

Yubileyny Mining and Processing Plant processes ore from Krasivoye deposit and concentrate from Perevalny Mining and Processing Plant.

Production volume
130
thousand tons of ore per year
Gold extraction
1 300
kg/year (2019)

Technology

  • Gravity concentration
  • Flotation

Mining

  • Underground mining

 

Gravity and flotation technology is used for extraction of gold at Perevalny Mining and Processing Plant.

Design capacity of the plant is 160 thousand tons of ore per year.

Target gold recovery factor is 91%.

Perevalny Mining and Processing Plant processes ore from Perevalnoye deposit (Brekchivaya and Priyatnaya areas).

Production volume
160
thousand tons of ore per year
Recovery factor
91%

Technology

  • Gravity concentration
  • Flotation

Mining

  • Open-pit mining

 

A mining and processing plant with a capacity of 1.5 million tons of ore per year is expected to be built at Malyutka Deposit.

*Design is in progress.

 
Production volume
1.5
million tons of ore per year
Recovery factor
65%

Technology

  • Heap leaching

Mining

  • Open-pit mining

 

Currently, alluvial gold is mined at two sites: “Buor”, “Kagkan-Chudny”.

Gold extraction
330
kg (2019)
Average operating thickness of sands
1.6 - 2.2
meters

Technology

  • Hydromechanical method with separate peat extraction and sand washing

Mining

  • Mine stripping

 

Prospects

Project Prospects

Increasing the production capacity of Yubileiny Mining and Processing Plant to 400 thousand tonnes of ore per year.

Introduction of heap leaching technology at Perevalny Mining and Processing Plant.

Underground mining of Perevalnoye deposit reserves.

Deep-lying placers - Khayunda and Kurun-Uryakh areas, which are planned to be developed in 2021-25, are promising.

The company’s strategy is to supply reserves to current facilities and to carry out exploration works at prospecting sites

 

Project News