Mining of platinum group metals in Norilsk Industrial District
Integrated project
Implementation

Project Implementation

The project is expected to be implemented in two stages.

 

At the first stage, mining will be carried out by open-pit method at Chernogorskoye deposit, and at the second stage — by underground method at the southern part of Norilsk-1 deposit.

The project includes construction of two concentrators and a smelter.

Alliance Group has all necessary resources: finances, experienced staff and advanced technology.

The total production capacity after completion of two stages of the project will amount to 14 million tons per year

There is an option to build a third concentrator with an increase in the total production capacity up to 21 million tonnes/year and life of mine reduction to 40 years.

Production
1.75
million ounces 4E/year
Production launch
2024
 
Matte Separated Products
PGM Copper Nickel
200 tonnes/year 55,000 tonnes/year 30,000 tonnes/year
Stages
Implementation stages
The project is implemented in two stages and will last from 2024 to 2077.
Back Zoom Out Zoom In Stage 1
Back Zoom Out Zoom In Stage 2

At the first stage, the reserves of Chernogorsky open pit will be involved in development (start of ore mining from 2023, start of processing at Concentration Plant 1 - 2024).

The production volume will be 7 million tons per year. Concentration complex will be located in close proximity to the open pit.

Mining
7
mln tonnes/year
Ore Reserves
131
mln tonnes
Processing
7
mln tonnes/year
Output
260
ths. tonnes/year
concentrate capacity
Production
2024–2043
 

Technology

  • Gravity concentration
  • Flotation
  • Dry storage of tailings

Development

  • Eastern part - open pit (20 - 245 m)
  • Western part - underground (350-800 m)

 

At the second stage, the Southern part of Norilsk-1 deposit will be added to development of Chernogorskoye deposit.

2nd concentration plant and metallurgical plant will be launched in order to increase ore processing capacity.

Mining
14
mln tonnes/year
Ore Reserves
447
mln tonnes
Processing
7
mln tonnes/year
Output
700
ths. tonnes/year
concentrate capacity
Production
2028–2077
 

Technology

  • Gravity concentration
  • Flotation
  • Dry storage of tailings
  • Concentrate Separation
  • Metallurgy

Development

  • Underground mining
  • Sub-level caving
  • Two declines 10.4 km each from S.p. Norilsk-1 deposit
  • Two ventilation shafts (10 m diameter)
  • Converging ore haulage through declines from S.p. Norilsk-1 deposit

 

Hydrometallurgy

Hydrometallurgy Production

The metallurgical plant is planned to be constructed to produce matte.

The facility will comply with modern environmental and industrial safety standards. In particular, sulfur emissions per 1 ton of produced non-ferrous metals will be less than 21.6 kg. It is planned to dispose of sulfur with the production of gypsum.

Development of a process cycle up to metallurgical production in order to obtain a highly-refined product
PGM Concentrate Production
200
tonnes per year
Sulfa utilize in gypsum dump
 
 

 